 |
 |
|
This is a picture taken from the stairs looking at the new top fuel bike we built. |
The new shop has lots of room. The door on the right goes into the machining and welding room. |
 |
 |
|
Again looking down at the shop and some of the bikes we are working on. |
This is the compressor room and bathroom. We put a show case in the wall for some of Andy's collectables. Above is 2 show cases,
1 for Andy's 1962 Harley Davidson "scat' and the other will be for trophies and plaques. |
 |
 |
|
There are 4 work stations to work on bikes and all have their own work bench. Looking through the window is the machining room. |
Another look at the door and window into the machining room. |
 |
 |
|
We are building a P/F bike for a good customer using Rob Smith's old T/F bike. Andy had a few chassis repairs
to do and they turned out great. It will make a real nice P/F bike. |
The chassis was stripped using chemicals but the stripper brush blasted it. We don't like sand blasting race chassis. |
 |
 |
|
Andy fixed all the carbon fiber and is putting on new fender struts. He is also making new lower side panels and fitting our new
1 piece carbon fiber seat pan. |
New rear wheel, tire and sprocket are installed. |
 |
 |
|
We had to make new motor plates as this bike will be running a brand new Hammer motor. We have great luck with
these motors and I purchased 3 brand new ones. This will get the customer running in a nitro class for a real reasonable
price. |
We would like to complete this bike sometime in Feb. We are very happy with the way it is going so far. We will have new
pictures every couple of weeks so please keep checking in. |